How do I create time tags?
With time tags, companies can measure and evaluate the working time for a specific tag in addition to the general working time. For example, the working time used for a specific project can be measured and evaluated individually.
If you want to create a time tag, proceed as follows:
- To create a time tag, click on the Companies tab in the left-hand navigation bar.
- Your settings will open. Then click on Time Tags in the horizontal navigation bar.
- A new window opens. Click on Add Time Tag .
- A window opens in which the time tag can be created. Enter a name for your time tag in the input field under Name of tag and then add the corresponding teams under Assigned teams .
- Then click on Save to create your time tag.
If you want to edit a time tag, proceed as follows:
- Click on the pencil icon next to the time tag to edit it.
- Use the Status button to temporarily archive the time tag or to reactivate it.
- Then save your changes by clicking on Save .
- If you want to delete the time tag permanently, click on Delete Tag .
Updated on: 05/05/2025
Thank you!